CASE STUDIES

Breakthroughs in the wild.

How a VFX studio ran production on Orion, and how a systems integrator and two AI product teams run theirs today. Every number is measured and sourced.

What R3D Studios measured while it ran on Orion.

Up to
~40%1
compute cost reduction
/methodology#compute-cost →
 
60-90s3
to provision a workstation
/methodology#provisioning-time →
Up to
92%4
GPU utilization, against a 10–15% enterprise baseline
/methodology#gpu-utilization →

1–4. Results R3D Studios reported while it ran on Orion. R3D is a past customer, so these describe that period.

4. The 10–15% baseline is the typical enterprise GPU utilization we use across the site. See /methodology for how each figure was measured.

Write your own before and after.

Start a Proof of Value on your own hardware, and we’ll measure it the same way.

Write your own before and after.

Start a Proof of Value on your own hardware, and we’ll measure it the same way.

Write your own before and after.

Start a Proof of Value on your own hardware, and we’ll measure it the same way.